Calling on the services of a land surveyor
This article relates to practices in the US.
There are several things you need to think about before hiring a good land surveyor:
- Make sure that they are licensed: One way to ensure that you are placing your property in the right hands is to confirm they have a license. This should be a priority since only a licensed surveyor's report will be considered valid. In order to verify an existing valid license, check it with the state licensing board.
- They must have insurance. All professional businesses should have general liability and worker's compensation insurance. The purpose of this type of insurance is to ensure that you are protected should they or one of their employees suffer an injury while performing their tasks on your property. However, only some states consider this kind of insurance a necessity while others merely consider it as optional.
- They must have adequate experience: Always keep in mind that surveyors also have their own special areas. There are surveyors who are more skilful in providing a land development survey, others are best in staking the construction layout, some are good at mapping, and so on. Discuss your particular project with the land surveyor and ask about their knowledge and experience in this kind of work. Your priority should be to select the most experienced and knowledgeable professional, not the least expensive.
- Check whether they are technology oriented: It can be beneficial if you enquire about the surveyor's knowledge of the latest technological advances in surveying. Enquire about their knowledge of global positioning systems, laser scanning, computer aided drafting and so on. While you may not need some of these services on your project, a surveyor who keeps up with their professional development through continued study will usually be a better choice.
- Make professionalism a priority: It is not enough that they are a competent land surveyor. They must be prompt in answering your queries and must be thorough in explaining how they will perform the entire job.
- Everything agreed must be in the written contract: Make sure the contract provides the details of the whole work, including the specific assignments and the mode of payment. You should understand exactly what you will be getting, that is, the deliverables for the job. Also, the usual practice after the contract is executed is that the surveyor will obtain a partial payment while the remaining balance will be given once the whole project is completed and delivered to you.
https://www.modricsurveying.co.uk/
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.
The changed R&D tax landscape for Architects
Specialist gives a recap on tax changes for Research and Development, via the ACA newsletter.
Structured product data as a competitive advantage
NBS explain why accessible product data that works across digital systems is key.
Welsh retrofit workforce assessment
Welsh Government report confirms Wales faces major electrical skills shortage, warns ECA.
A now architectural practice looks back at its concept project for a sustainable oceanic settlement 25 years on.
Copyright and Artificial Intelligence
Government report and back track on copyright opt out for AI training but no clear preferred alternative as yet.
Embedding AI tools into architectural education
Beyond the render: LMU share how student led research is shaping the future of visualisation workflows.
Why document control still fails UK construction projects
A Chartered Quantity Surveyor explains what needs to change and how.
Inspiration for a new 2026 wave of Irish construction professionals.
New planning reforms and Warm Homes Bill
Take centre stage at UK Construction Week London.